Before testing, touch the test leads together. The meter should read zero or close to zero. If it reads a number, for example 5 ohms, then you will need to subtract 5 ohms from each reading.

With the ignition off, disconnect the solenoid harness from the controller. Measure the resistance of all solenoids.

The Converter Clutch solenoid should be 7-20 Ohms.

The EPC solenoid should be 3-6 Ohms.

Shift solenoid 1 should be 12-28 Ohms.

Shift solenoid 2 should be 12-28 Ohms.